Constuction
Photos
Janurary
2004
A little break in the weather
today. It's been raining on and off the past several weeks, slowing
down our getting the roof on.
Click on a thumbnail to enlarge
photos.
|

Brickwork is mostly done
|

Peeking into the 2nd story Multi-Purpose
rooms
|

Future Emergency Exit stairwell
|

2nd floor decking
|

Looking toward the southeast corner of
our large Multi-Purpose Room
|

Our future locker rooms and game room
|

Brickwork on our small gym (left) will
soon be completed
|

Vicki looking at the jogging track around
our large gym
|

Inside the large gym
|

Future players box at small gym
|

Framework for the corridor stairwell
|

Demolition work on the old Police Services
Building
|
back to December
2003 or onto March 2004