Constuction Photos

July 2004

Concrete strips outline our landscaping plan

 

 

Installation of the Front Desk

 

 

 

Finishing the ceiling in our 2nd Floor Corridor

 

 

 

The track goes down

 

Subflooring in the Large Gym

 

Mixing the flooring for the Climbing Wall

 

Flooring is shredded tires

 

Slate Floor begins installation

Sinks in our Restrooms

Flooring in a Multi-Purpose Studio

Concrete pour outside

Climbing Wall flooring is supported by a CIWMB grant

The Mechanical Room is wonderfully tiny

Our front doors finally got here

The exterior on a sunny summer day

back to June 2004 or onto our Building Virtual Tour (coming soon)