March 2004
|
Windows are low-e glass to help moderate heat gain |
Lots of work in the lobby area
|
|
|
Climbing area framing
|
Laying hydronic tubing in lobby |
|
|
Our tubing for radiant heating laid out |
In a few days this will all be covered by concrete |
|
Hydronic tube hook-ups
|
Climbing area only has partial radiant heating
|
|
|
Concrete is transported by pump from the truck to the site being poured
|
Special shoes for walking around on the fresh surface |
|
|
Concrete pumped through the hose to the climbing wall area. |
Spreading it with hand tools |
|
|
Spreading and flattening the surface
|
Flattening it some more
|
Wow! Nice Work!
|