Constuction Photos

October 2003

We certainly love and appreciate the labor put into over 75,000 concrete blocks laid by hand for the walls.

Click on a thumbnail to enlarge photos.

Looking at interior walls from south

Weight room area (downstairs) and multi-purpose room (upstairs)

wood forms for windows and door

Carrying hose for the concrete pour

Concrete to pump to the 2nd floor

Walls are nearing the roof line

 

Scaffolding work-not easy work!

Future climbing wall area

Looking at the small gym

Rebar for the rounded corners in the small gym

Southeast area of the building

Setting the scaffolding to go up further

.

 

West side of the large gym

   

In a few weeks, we'll be far enough along with the block work to start getting steel trusses for the roof.

Click on a thumbnail to enlarge photos.

picture of north side

Darwin Hall in the background

 

North side, nearing roof line



Looking into the lobby

Interior brick detail

Lift for getting brick up high

Block work near the top



Checking out the climbing wall

A web of scaffolding

 