|
GEOG380: DIGITAL IMAGE PROCESSING |
||
Introduction to Digital Image Processing Software and Raster Data |
||
|
Introduction to IDRISI, raster files and palettes |
|
|
| Feb 1 (Th) |
Electromagnetic Energy and Interaction Mechanisms |
Chpt 2: Electromagnetic Radiation |
Introduction to Remote Sensing |
||
|
Feb 6 (Tu - 10) |
Spectral Response Patterns |
Chpt 10: Image Resolution |
|
Feb 8 (Th - 10 ) |
Lab 1: Spectral Response Patterns (Due Feb 13) |
|
Image Enhancement |
|
|
|
Feb 13 (Tu) |
Contrast Stretching |
|
|
Feb 15 (Th) |
Lab 2: Contrast Stretching (Due Feb 20) |
|
| Feb 20 (Tu) | Color Composites and Filtering |
|
| Feb 22 (Th) | Lab 3: Color Composites (Due Feb 27) |
|
| Feb 27 (Tu) | Exam #1 |
|
Image Classification |
|
|
| Mar 1 (Th) |
Supervised Classification I |
Chpt 12: Image Classification |
|
Mar 6 (Tu) |
Supervised Classification II |
|
| Mar 8 (Th) |
Lab 4: Supervised Classification (Due Mar 13) |
|
|
Unsupervised Classification Lab 5: Unsupervised Classification (Due Mar 20) |
|
|
Satellite Systems |
|
|
| Mar 15 (Th) | Data Acquisition, Platforms, Applications |
Chpt 6: Land Observation Satellites |
Importing Lab 6: Importing Satellite Imagery (Due Mar 22) |
|
|
|
Mar 22 (Th) |
Exam #2 |
|
Preprocessing |
|
|
| Mar 22 (Th) |
Introduction to / Review of Raster GIS |
|
| Mar 27 (Tu) |
Image Restoration and Transformation |
Chpt 11.4 Radiometric Preprocessing |
|
Mar 29 (Th) |
Lab 7 : Radiometric Restoration (Due Apr 17) |
|
| Apr 3 (Tu) |
Geometric Rectification |
Chpt 11.6: Geometric Correction |
Apr 5 (Th) |
Lab 8 : Geometric Rectification (Due Apr 24) |
|
Image Transformations |
||
| Apr 17 (Tu) | Vegetation Indices; Principle Components and Colespace Transformation |
|
| Apr 19 (Th) | Lab 9 : Vegetation Indices (Due Apr 24) |
|
| Apr 24 (Tu) | Exam #3 |
|
Project: Creating a Local Land Cover Map |
|
|
|
Apr 24 (Tu) |
Import and Enhance Project Data |
|
|
Apr 26 (Th) |
Geometric Rectification, Category Selection, Route plan |
|
|
Apr 27 (F) |
Field Trip - Collect Training Data |
|
|
May 1 (Tu) |
Supervised Classification |
|
|
Accuracy Assessment I: Sampling Scheme |
Chpt 14: Accuracy Assessment |
|
|
May 4 (F) |
Field Trip - Accuracy Assessment |
|
Accuracy Assessment II: Error Estimation |
||
|
May 10 (Th) |
Discussion of Final Project / Work on Project |
|
|
May 15 (Tu) |
Lab: Work on Project |
|
|
May 17 (Th) |
Exam #4 Lab: Work on Project |
|
|
May 24 (Th) |
Final Project Due (12pm) |
|